Main business

Our Business

Elevator installation


First, installation project special team

In the installation project management, our company implements the one-stop engineering service of the project leader system, and the relevant functional departments must serve and obey the scheduling and command of the project leader。Its main functions are:

Unified window and customer liaison work, as little as possible trouble customers;

Unified scheduling and coordination of all aspects of the project;

To ensure that the project can be completed safely, quality, on time and efficiently;


Second, installation quality assurance

Before the construction, our company will formulate a complete construction plan according to the construction requirements to ensure that the construction progress can be carried out as planned, and to ensure that the project can be completed safely, with quality, on time and efficiently。In case of abnormal conditions, different strain methods are adopted according to different construction stages。

The guarantee measures of construction technology are as follows:

1. The installation team leader is responsible for solving the technical problems on site and accurately reporting the existing problems back to the installation technical team。

2, when the installation team leader will feedback the technical problem back to the technical team, the technical team must quickly arrive at the construction site to understand the situation, implement each technical measure, or the problem directly to the technical section of the engineering department。

3. The Technical section shall specify the solution according to the reflected situation, and supervise the implementation of the technical requirements by the construction team through the technical team。

4, During the construction of the construction class, our company in accordance with the normal quality management mode, the implementation of site supervision system, by the installation team leader in each link of the project quality inspection, found problems corrected in time。

5, after the completion of the key main process, it must be checked and confirmed by the inspection department personnel before it can enter the next construction link。

6, the inspection department must carry out the quality inspection of hidden works to ensure the quality of construction。 The whole ladder commissioning must be carried out by our professional commissioning personnel to ensure the quality of construction。

7, the construction team leader of each elevator, according to the actual construction situation to fill in the self-inspection report, the whole ladder debugging after three days of trial run to ensure the stability of operation。

8, the inspection department after the implementation of the above quality inspection procedures, dispatched full-time personnel, according to the quality management regulations issued by China to the elevator quality acceptance。

9, during the entire construction period, the company's relevant engineering and technical management personnel will visit the construction site, timely correct the construction of mistakes, leakage of technical problems, to ensure high-quality construction management, implemented to every link of work。


3. Engineering safety measures

1. Before the installation team enters the field, our company organizes the head of safety to educate all construction personnel on construction safety, so that they can establish the correct idea of safety first。

2, each construction site set up a safety responsible person, responsible for construction safety management and supervision。

3, each construction site, according to the different number of stairs, each ladder is equipped with more than two fire extinguishing equipment。

4, each construction personnel must be licensed to work, wear personal protective equipment to enter the construction site (protective equipment including: safety helmet, safety belt, work clothes, gloves, protective goggles, work shoes)。

5, the use of lighting, construction electricity, must comply with the rules of electricity, to eliminate random pull, random connection phenomenon, drag plate must be equipped with leakage protection switch。

6, around the installation site, add security fences and post safety signs to prevent irrelevant personnel from entering the construction site。

7, in the construction, the safety staff of the engineering department, the company's safety department inspector, will arrive at the construction site from time to time for safety inspection, timely elimination of safety hazards in the construction, to ensure the smooth progress of construction。

It should be noted that after the installation of the elevator, it must pass our company's internal inspection before it can be delivered to the Technical Supervision Bureau for acceptance, and check the layers to ensure the installation quality of the elevator。


Four, equipment 24 hours call repair service

Elevator failure, our company will appoint qualified and experienced professional engineering and technical personnel to provide quality service for elevator products (warranty period and paid maintenance period), to ensure that 24 hours a day, fast repair and maintenance services for each elevator project。After receiving the fault, it will arrive at the scene within 60 minutes。Each elevator installed by our company has a separate database, the initial information of installation, setting environment, frequency of use, number of failures, causes, repair and transformation, etc., all data are managed and analyzed by computers, so that each elevator can be scientifically maintained。

In addition, our company has also launched a 24-hour elevator maintenance after-sales service hotline


Five, product warranty period

Warranty period: Our company according to the national regulations of the elevator products normal three warranty period of 12 months。During this period, our company provides repair and maintenance services under normal use of equipment。

Warranty period: After the equipment installation and debugging, acceptance, our company provides one year spare parts replacement free door-to-door warranty service。


6. Training handover

Our company will provide free on-site training for users of elevator technical operators, the number of users to determine, to teach the installation of equipment, operation, maintenance and matters that should be paid attention to, to help users better use the elevator and maintain the normal operation of the elevator。